This page shows the details for a Demolition Case.
Case No: 25-334 Amendment: 0 Emergency: NO | Date Received: 5/1/2025 8:42:48 AM |
Building Name: Schnell Farms PUD - Existing Detached Barn Structure | Date Posted: 5/1/2025 |
SWCAA Staff: Mihai Voivod | Date Paid: 5/1/2025 |
Site Address: no situs address 20102 NE 16TH ST - Owners Address Camas, WA 98607 CLARK COUNTY |
|
Facility Type: Farm Buildings | Building Size: |
Prior Use: Miscellaneous | Present Use: Miscellaneous |
# Floors: | Building Age: |
Demolition Method: Demolition of existing open barn structure with standard construction equipment. | |
Emission Prevention: Personal protective equipment and hazardous material documented, as needed. | |
ACM Procedures: None present. | |
Comments: Demolition of barn structure as part of subdivision development clearing. |
Demolition Contractor: Rotschy, Inc. | |
AHERA Company: Dalton LaFever | |
Property Owner: Louis C. Schnell , |
Submitted by: Nick Edwards - Land Project Manager | Representing: |
Email: nicke@buildplh.com | Phone No.: |